Australian AI sovereignty, part 1: power and place

27 NOVEMBER 2026 · BY STEVE WADDINGTON AND CLARE

Building AI sovereignty for a country the size of Australia is impossible. Here are all the reasons it can't be done...

That is pretty much the same for any sufficiently large and complex task. Yet large and complex tasks get done.

To give some perspective, first look at the mining industry. By geographical coincidence, something I am close to here in Perth.

Every morning Perth Airport is full of hi-vis wearing FIFO workers coming to and from mine sites. Mining. Mining is great for Australia. But not without drawbacks of:

Yet all those things are overcome because of the promise of the ROI. For AI, the return is the kind we already accept from roads, airports, power grids and the NBN, infrastructure the country decides it can't do without. Who pays for it and who owns it is question 6.

Does that look familiar?

Pretty much every obstacle put in the path of AI development in Australia is one that has already been overcome in mining. To the great benefit of the nation.

How big?

Scale is a range, depending on what we want from sovereignty. We can spend a hundred million or so, like the Swiss, or a hundred billion. What we should not do today is commit to a future spend on technology that will age very, very quickly. What we want, as a minimum, is enough now to give us the ability to take full advantage of developing technology. What we don't want is to be playing catch-up in ten years' time. Build now for what we need to do that, knowing full well the technology is self-bootstrapping. We want our own bootstrap.

AI is developing faster than any technology before it, because unlike any other technology, AI actively contributes to its own development, and increasingly so the further it is developed. By May this year more than 80 per cent of the code going into Anthropic's codebase was written by Claude, up from low single digits early last year.

So I'm not going to say here how big it should be, only that the cost scales with the capability. What follows are my answers to the usual objections on power and place, and they work at any size. A bigger site just needs more panels.

Land

We already accept more than two thousand square kilometres of WA being dug up for mining. That is the disturbed land, not yet rehabilitated, that mining companies reported to the state at the end of June this year. People object, of course, and we work through those objections for iron ore and rare earths because the country wants what comes out of the ground. A data centre and its solar farm are a far lighter touch than an open pit.

We already have sites of high environmental impact. Would a 10,000 hectare mine site be any worse if 10 hectares were given over to a data centre, and a thousand or two more to the solar farm that runs it? The mine already has the roads, the airstrip, the camp and often its own power station. Use the same land and the same infrastructure.

Cable

Mine sites are serviced by road and rail. Running a bulldozer with a ripper and a spool of fibre cable alongside the existing transportation infrastructure is a cost. But a trivial cost compared to the cost of the road or rail line in the first place. Pricing for laying long-haul fibre is very location specific, but it typically runs from $20 to $120 a metre, the low end in rural areas and the high end where there are pits, towns and city streets to dig up and restore.

Inland Rail was estimated in 2022 at $31.4 billion for about 1,700 km, more than $18 million a kilometre, so even at the top of that range the fibre is well under one per cent of the railway. Most of the cost of fibre is in the digging. In 2009 Optus told the ACCC the NBN could be built for as little as $18 billion strung on existing poles, against as much as $60 billion underground. Where a road already runs, laying fibre alongside it means new ground doesn't have to be surveyed and broken.

Power

We have lots of sun, and lots of land. Before I talk about the solar, let me float an idea I had some time ago as a cost effective cooling solution for data centres. Does modern computer equipment really need micro controlled temperature? Think about your PC, it has worked just fine for years, shoved under your desk, running in any range of temperatures. My GPU for example runs between 40 degrees and 85 degrees when it is under load. And here is the thing: air temperature of 40 degrees will still carry away waste heat from an 85 degree cooling fin.

Maybe, just maybe, huge AC plants are just not needed. Air circulated in sufficient volume, even at high ambient temperatures, can keep computing equipment within temperature operational parameters. Big fans, good filters, cleaned weekly. Enough AC to handle the 2-3 weeks a year when the temperature peaks.

My idea was so innovative in 2005 that I could not get a single contractor in Sydney to agree with it. Now the whole industry does it, although it got there by a different route. Google was running a data centre in Belgium without chillers by 2009, and Facebook's Prineville centre in Oregon was cooled with outside air from 2011. AI hardware now runs too hot for air, so the racks are cooled with water instead, but that water can go in at 45 degrees, and Nvidia's Jensen Huang said at CES this year that its newest racks don't need a chiller. The overhead of cooling and everything else goes from about a third of the power in the average Australian data centre to about a tenth.

It's swings and roundabouts in the desert, too. The cooling load peaks in the middle of the day, when the solar farm is producing the most, and falls away after sunset. Kalgoorlie has had between four and 28 days of 40 degrees or more each year since 2009, which is about the two to three weeks I allowed for.

Nevertheless, power is still needed, and it's still a large draw, but nothing a million solar panels can't solve. A million of the latest 700W panels will run a data centre of about 150MW around the clock, and a bigger one just needs more. Expensive? Yes, but cheaper over its lifetime than the grid. On CSIRO's GenCost figures, solar with batteries to get through the night works out at about 10c a kWh over its life, against about 17c for a large WA business buying from the grid, before network charges.

A sparse solar panel grid can even be beneficial to the environment, cooling the ground and making a desirable habitat for flora and fauna. At a UK solar park the soil under the panels was up to 5 degrees cooler on a daily average from spring to autumn, and at two northern Victorian solar farms it was up to 10 degrees cooler at midday in January, with the sheep choosing to rest in the shade.

The mines are already doing it. Gold Fields' Agnew mine, about 1,000 km north-east of Perth, runs on a wind, solar, battery and gas microgrid and gets 50 to 60 per cent of its energy from renewables.

And a data centre that brings its own power takes nothing from the grid. In the first post I said a sovereign capability adds to an already growing load and grid connection is slow. A site like this doesn't wait in the connection queue, and it doesn't add a cent to anyone else's power bill.

Place

But how do you get the staff to look after remote data centres? Well, FIFO works for mining. I think a data centre technician would be quite happy to have their pay bumped up to that of a FIFO worker. Week on, week off. Not for everyone, true, but not a show stopper either.

Or Kalgoorlie. A pretty nice town with lots of facilities. It's at the eastern end of WA's main grid, so there's a connection for backup, and Telstra's new Perth to Sydney fibre route runs through it. It has an airport and the train to Perth, and Curtin's WA School of Mines is there to train people. Technicians can live there rather than fly in, and a town that has been mining for more than 130 years isn't going anywhere when one mine closes.

So that is my answer. Some 'out there' thinking, use locations and infrastructure we have already built, and use what's available on the market for the rest. Two data centres like that give us redundancy, and three is better.

The land, the cable, the solar farm and the building will still be doing their job in thirty years, by which time the chips inside will have been replaced half a dozen times. There are many Telstra 'money box' buildings, one on Wellington Street in Perth in fact, that were built to house telephone exchange equipment. They became mostly empty as the technology advanced, and whatever they house now is orders of magnitude more capable than what they were built for. There's no reason to think the same won't be true for AI data centres.

How we get those chips, and keep getting them, is the next question.